0 Piece,Product Price: US $ 0
Quantity(Piece/Pieces) | 1 ~ 1000 | >1000 |
Est. Time(days) | 7 | To be negotiated |
If you finish the payment today, your order will ship out within the delivery date.
1. Ceramic tube 6G/H ozone generator accessories consist of two parts: ceramic ozone tube and high voltage power supply.
2, the composition and characteristics of ceramic tube: internal electrode 316L stainless steel, external electrode aluminum alloy radiator, dielectric material 97 alumina refining, polytetrafluoroethylene and fluorine sealing original combination, double air cooling heat dissipation, the interface is a pagoda structure, the inner diameter of 6 ~ 8MM tube is connected, the nozzle with the internal diameter of 8MM anti corrosion and antioxidant The hose is connected (fluorine hose). The main feature of the ceramic tube generator is the dielectric dielectric value Changshu high. The medium toughness is not bad in good luck, the coefficient of thermal expansion is low, and the maximum pressure of the gas source can reach 0.1MPA. Normal service life is usually 20 thousand hours.
Small volume:The volume of ceramic ozonation unit is smaller than 1/3-1/2.\
\
\
\
\
The first step: the high voltage power supply and the ozono tube are installedInsulating boardThe insulation board is fixed in the chassis. Attention should be paid to the ozone tube and the high voltage power supply from the metal case shell.More than 3 centimeters(high pressure parts, if too close to the casing of a metal chassis, may form high pressure swirl to affect use or even damage). The position of the ozonic tube is on the chassis.Convective wind spaceTo ensure that the fan at the time of operation can blow the heat sink of the ozone tube to ensure that the outer electrode of the ozone tube is cool and stable.
The second step: the installation of air intake and ozone outlet: the air nozzle of the ozone tube is not divided into and out of the gas nozzle, at any end, and the material of the air inlet can be made of silicon rubber tube or PC hose.Antioxidation pipe for outlet(4, fluorine, fluorine hose, etc.) connected, and it is required that no gas be leaked. The gas entering the ozone tube inlet, whether it is oxygen or air, must be ensured.Clean drying of gasThe temperature should not exceed 45 degrees and the humidity should not exceed 70%.
The third step: the installation of potentiometer, potentiometer installed on the control panel of chassis, convenient for users to adjust.
Fourth step: check the line: high voltage line and high voltage ground line after the ozonizer, we should try to connect the high voltage line to the shortest distance. The high voltage line is about 40CM when the accessories are out of the factory. When the installation is installed, the high voltage line is cut short as far as possible to avoid the high pressure line touching the other lines or objects in the chassis. If the conditions are available, high voltage wire can be made of silicone tube with a diameter of 8MM to make it safer. Other lines, especially digital device connections, do not close to the high pressure part (high pressure package, high voltage line, ozonate), otherwise the high pressure may interfere with its normal function.
Use:The main generator parts of the air - cooled ozone disinfector. It can install a set of air-cooled ozonizer with higher output.
Demand for gas supply:Oxygen 1~5L/MIN, air 10-30L/MIN (air source temperature is not higher than 45 degrees, humidity is less than 75%).
Working environment:The ambient temperature is less than 45 centigrade, and the drying and ventilation are good.
1, installed equipment should be placed in a dry and ventilated clean environment. The ambient temperature is between -10 and 40 degrees, and the relative humidity is less than 85%.
2, when the equipment is maintained, the power line must be disconnected.
3, regularly check the ventilation venting on the equipment. If there is more dust, remove it and clean it in time.
4, the equipment can work continuously for 24 hours for a long time, but please ensure that the equipment is well ventilated and heat dissipated.
5, the wet towel used for cleaning the chassis must be twisted dry and used. Do not splash the water into the machine.