Quantity(Set/Sets) | 1 ~ 10 | >10 |
Est. Time(days) | 15 | To be negotiated |
If you finish the payment today, your order will ship out within the delivery date.
Hydraulic water drilling rig long spiral folding driver
Pile driver consists of pile hammer, pile frame and auxiliary equipment. The pile hammer is attached to two parallel vertical guide rods (commonly known as longmen) at the front of the pile frame and lifted by lifting hook. The pile frame is a steel structure tower with a hoist at the rear for lifting the pile and pile hammer. In front of the pile frame, there is a guide frame composed of two guide rods, which is used to control the driving direction of the pile and make the pile penetrate into the stratum accurately according to the designed orientation. The basic technical parameters of pile driver are impact weight, impact kinetic energy and impact frequency.
Vehicle
OCD-7
Drilling diameter
300mm(OEM)
Drilling depth
7m(OEM)
Bit speed
120r/min
Track width
450mm
Working speed
5km/h
Dimensions(L*W*H)
Diesel Engine
Type
4105Turbo
Power
85KW
Cylinder
crawler
Cooling Type
Water cooling
Hydraulic system
Type
CBG1-F040/040
Speed
2000-2400r/min
Torque
2000N·m
Scope of application
FAQ
Q1. Are you manufacturer or trader?
A: We are manufacturer of construction machines. Actually, we produce most of the parts in our own factory for better cost and quality control.
Q2. What is your terms of payment?
A: 100% T/T,or T/T 30% as deposit, and 70% against machine is ready .
Q3. How about your delivery time?
A: Generally, it will take 15 days after receiving your advance payment. The specific delivery time depend on the items and the quantity of your order. Sometimes we have some in stock.
Q4. Are you interested in dealership with local company?
A: Yes, we are quite interested in this business. We'd like to cooperate with some local partner to sell more World machines in local market and supply better service.